Project Detail
The building is provided for placing of peat factory technological equipment. Delivery and installation of metal constructions. Volume 21.04 tons. There were performed installation of Z-profiles, installation of roof sandwich panels, roof finishing, installation of wall sandwich panels, wall finishing.
The total area 525 m2.