Kvalitatīvas tērauda konstrukcijas.

Peat factory in Baloži

Project Detail

The building is provided for placing of peat factory technological equipment. Delivery and installation of metal constructions. Volume 21.04 tons. There were performed installation of Z-profiles, installation of roof sandwich panels, roof finishing, installation of wall sandwich panels, wall finishing.

The total area 525 m2.